Net Metering 2 Ends April 14th, 2023

resulting in significantly reduced solar savings.

Days Left

Day(s)

:

Hour(s)

:

Minute(s)

:

Second(s)

But You Need to Act Before March 15, 2023

PG&E may delay application processing due to unprecedented high volume

Net Metering 3 Summary

This change means that electricity export rates (the power you don’t use and send to the utility) will be drastically reduced from a current average of $0.30/kWh under NEM 2, to $0.02/kWh under the new NEM 3 net billing rates.

The good news is that if you act quickly to file your PG&E interconnection before April 14th 2023, you will be grandfathered into Net Metering 2.

Net Metering 3 Call to Action

Don’t Wait – Install Solar and Battery Storage Now!

In order to meet the Net Metering 2 April 14th 2023 deadline PG&E needs the following three documents filled out completely and accurately:

    1. Signed solar installation contract and disclosure forms
    2. Solar system design details
    3. Completed interconnection agreement

Solar and Storage contractors will be extremely busy as homes and businesses rush to beat the April 14th deadline and PG&E will likely be overwhelmed with applications so we recommend acting by March 15, 2023. Don’t delay. Get started today.

Learn More about Net Metering 3

Learn more about Net Metering 3 and actions you should take now to get grandfathered into Net Metering 2 in this timely video.

NEM3

Don’t delay. Complete the form below to get your free solar quote today and lock into NEM-2 before the deadline.

* These fields are required.